Underground Infrastructure Underway At Toll At Cavasson Site
Toll At Cavasson Underway!
Things change fast in “The Valley.” Blink and you miss it. Just months ago, this site sat quiet. No equipment. No pipe. No movement. Now, early site work and underground infrastructure are clearly underway at Toll at Cavasson, signaling real forward motion in North Scottsdale.
Quick Points
-
Early site work now visible on-site
-
Underground stormwater systems installed
-
First-quarter 2026 activity marks a major shift
-
Long-awaited project moves into active construction
Also Read: News And Photo Updates For Cavasson And One Scottsdale

Dirt Starts Moving In North Scottsdale
This is the moment watchers wait for. In summer 2025, driving past this site meant dust and nothing else. Fast forward to the first quarter of 2026 and the scene looks different. Earth has been moved. Infrastructure is going in. Materials are staged and crews are active.
This phase goes well beyond basic excavation. What you’re seeing is full site work with underground infrastructure underway. Stormwater systems are being installed. Grading is established. Pads are taking shape. It’s the final stretch before foundations enter the picture.
This step matters. A lot.
-
Grading already completed
-
Stormwater infrastructure visible
-
Underground piping staged on-site
-
Permitted construction activity underway
Once underground systems start, the project timeline firms up. The quiet phase ends here.
Also Read: The Timeline, Size, And (Potential) Pricing For Toll At Cavasson

What The Photos Tell You Right Away
You don’t need plans to read this site. The visuals do the talking. Large black HDPE pipes point to stormwater conveyance. Vertical metal structures mark future drainage points. Heavy equipment fills in the gaps.
This is the kind of progress that confirms intent.
-
Drainage infrastructure installed
-
Utility prep in progress
-
Equipment mobilized
-
Pre-foundation phase active
After this stage, concrete usually follows faster than expected. Momentum builds.
Also Read: The Timeline, Size, And (Potential) Pricing For Toll At Cavasson

Toll At Cavasson At A Glance
Toll at Cavasson is planned as a luxury townhome community within the larger Cavasson master plan in North Scottsdale. The project will bring 135 townhomes to an 11.27-acre site near Cavasson Boulevard and Miller Road.
Current expectations outline a clear picture of what’s coming.
-
135 luxury townhomes planned
-
Approximately 2,200 to 2,700 square feet
-
Pricing projected from $1 million to $1.2 million
-
Sales expected to begin in late 2026
Private garages, rooftop decks, and outdoor living areas are part of the plan. The product targets lock-and-leave buyers watching this corridor closely.
Also Read: What Is The Billion Dollar Row In The City Of Scottsdale, Arizona?

Why Cavasson Keeps Drawing Attention
Cavasson isn’t new. But it keeps stacking wins. This master-planned community in North Scottsdale continues to fill in with offices, hotels, dining, and residential projects. The framework is already in place, which is why new housing here draws immediate interest.
You see it in the surrounding activity. You feel it in pricing pressure.
-
Major office anchors already built
-
Hotels and restaurants operating
-
Multiple residential projects planned
-
Pedestrian friendly internal layout
Toll at Cavasson fits into that growth pattern without needing fanfare.
Also Read: Another Land Deal In The Scottsdale Road & Loop 101 Corridor

What This Milestone Signals
Early site work and underground infrastructure are the green light phase. It confirms approvals, capital, and commitment. Projects don’t reach this stage by accident. They get here because timelines are moving.
For anyone tracking North Scottsdale development, this is real news.
Concrete comes next. Vertical construction follows. And once that starts, visibility changes fast.
Keep watching this one. The ground already is.